This section includes all labor, materials, tools, equipment, scaffolding,
and services required to finish and install all gym divider curtain equipment:
Furnish and install necessary hardware to attach gym divider curtain to
building.
Clean up and disposal of debris as a result of this work.
Work not included:
All electrical power, conduit, wiring, junction boxes, key switches
and plugs which shall be installed by electrical contractor.
Finished coat of paint (if necessary).
1.02 SUBMITTALS
Shop Drawings: Contractor shall submit to the architect complete shop
drawings and as built drawings. Drawings shall show method of anchoring,
support, mounting locations, etc. Templates for all embedded bolt anchorages,
sleeves, etc. Six (6) copies of each drawing or diagram shall be submitted.
1.03 WARRANTY
A. Furnish three (3) copies of a written guarantee of all labor,
equipment, and materials for a period of all one (1) year from the date of
substantial completion of the building.
PART 2 - PRODUCTS
2.01 MANUFACTURERS
Acceptable manufacturers: Subject to compliance with requirements,
with minor variations as accepted by manufacturer due to manufacturing
differences, provide products by one of the following:
ADP LEMCO INC.
5970 W Dannon Way West Jordan Ut. 84088-6203
Phone toll free: 800-575-3626, Email: sales@adplemco.com
2.02 MATERIALS FOR MODEL NO. 6100, WALK-DRAW GYM DIVIDER CURTAIN
Structural support
The support system shall be a die formed clamp system rated at 500 lbs.
minimum and designed to conform to the building structure. Supports are not
to exceed 8'-0" maximum O.C.
Track
Shall be heavy 16 gauge galvanized steel with the channel connected
to supports by means of a 1/2" eye-bolt and swivel hook. Tandem precision
ball bearing nylon rollers shall support the curtain with No.8 x .135 Jac
chain and S-hooks. The S-hooks are attached to the curtain through No. 2
spur grommets set in the top hem of the curtain.
Control
The key switch shall be a high security, three position, momentary
contact switch and shall be supplied with a flush type wall plate by ADP.
A single electrical box shall be provided by others.
Construction
The solid vinyl shall be 18 oz. vinyl polyester reinforced fabric.
The mesh vinyl shall be 6.5 oz. polyester woven weave coated with
polyvinyl chloride. All seems to be electronically welded with 1"
wide full contact bar welds. A pocket shall be formed at the bottom
of the fabric, the full length of the curtain to accept a continuous
2/0 coil proof chain. Choose color of vinyl from manufactures standard
colors.
Choose One:
Curtain types
Total solid vinyl.
Total mesh vinyl.
Combination solid and mesh vinyl (solid lower section of vinyl
8'-0 to 10'-0 standard)
Choose One:
Parting system
Single-pull.
Bi-parting.
Bi-parting center overlap (3'-0")
Other (describe)
2.03 OPTIONAL ACCESSORIES
Nylon interlocking tie-back system.
Stacking parallel to wall
PART 3 - EXECUTION
3.01 INSTALLATION
Shall be completed by an installer who is experienced in installing gym divider curtains.
The manufacturer shall approve installer.
Installation shall adhere to manufacturer's printed instructions and accepted shop drawings.